Completed in 2022, the 11,519 s.f. gymnasium replacement consisted of all new flooring and paint work, bleachers, new basketball equipment, dedicated locker rooms, and new bathrooms. Environmental branding was added to the space, featuring the school colors throughout, as well as the school logo on the exterior of the building. Renovations were also done to the lobby, adding in environmental branding and creating a welcoming space for students, staff, and the community.
- 11,519 S.F. Gymnasium
- 4,668 S.F. Lobby and Locker Rooms
The Community Engagement Planning Process with Meridian CUSD #15 resulted in a clear direction, to reduce the number of campuses from four to two and concentrate resources to make these remaining two campuses healthy, safe, and educationally relevant.
The design for the Knoxville High School began with visioning workshops to determine the desired educational practices and programs. After understanding the variety of learning environments recommended to meet the needs of 21st century curriculum and instruction, BLDD's task was to group these learning environments into a cohesive organization that facilitates a seamless delivery of the educational program.
As a component of the April 2019 referendum, Hixson Middle School was to be expanded so that it could receive the school district’s sixth grade students after another district facility transitioned from a single grade and specialty school to a K-5 elementary school. The current middle school, originally opened in 1955, would require both renovations and building additions to accommodate the increase in student population.